Promotion fashion wine bottle folding umbrella with eiffel tower printed

FOB Reference Price:Get Latest Price
US $1.7-2.5 / Piece | 1000 Piece/Pieces (Min. Order)
Supply Ability:
600000 Piece/Pieces per Month
Port:
Xiamen port,China
Report Suspicious Activity
Overview
Quick Details
Type:
Umbrellas
Material:
190T polyestor coated silver
Place of Origin:
Fujian, China (Mainland)
Brand Name:
HODA
Model Number:
HD FM1019
Name:
folding umbrella
Size:
21''*8K
Fabric:
190T polyestor coated silver
Color:
Customized
Frame:
Zinc plated metal ribs,chrome plated metal shaft
Handle:
plastic handle
Tips:
metal tips and plastic top
Printing:
as per your request
Function:
manual open&close
Port:
Xiamen port,China
Packaging & Delivery
Packaging Details
3 fold auto open and close umbrella
packing:1pc/polybag, 30pcs/carton
Delivery Time
Shipped in 35 days after payment

Promotion fashion wine bottle folding umbrella with eiffel tower printed

 

Product Description 

Certifications:BV audit, ISO,SGS,TUV,CTI etc. passed
Model No.HD FM1019
Product:3 fold umbrella 
Size:21''*8K
Material1)Fabric:190T polyestor coated silver
2)Frame:Zinc plated metal ribs, chrome plated metal shaft 
3)Handle:plastic handle
4)Tips:metal tips and plastic top
Coloras per your request
Printing:as per your request
Function:manual open&close
Accessories:Sewing label, hangtag,etc.
MOQ:2000pcs
Sample’s lead time:About 5-7 days
Delivery time:35-45 days
Supply ability:600,000pcs Per month.
Payment Term:T/T, WESTERN UNION,MONEY GRAM
Packing Details:1pc/polybag, 30pcs/carton                         
Carton size: 25.5*24.5*41CM, N.W:16.0KGS, G.W:16.0KGS

 Product pictures 

 

 

Our Certifications 

Our Exhibition

 

  • All customers’ inquiries will be replied within 24 hours
  • Any umbrella can be made according to your design or what you have required
  • Reasonable and competitive price will be provided
  • Mass production will be arranged ASAP once the order is placed and 30% deposit is paid
  • We have strict quality control system, from the material purchasing, production steps to the inspection and packing
  • The most economical and reliable shipping company will be chosen to make sure you can receive the goods in time
  • Delivery time can be 35-45 days after the order is placed, depending on quantities